Launch offer — valid today only

📄 Digital book in PDF · read it on your phone or print it

Means of Egress, Illustrated: Review Every Plan in the Same Order, Based on the IBC with NFPA 101 Notes One Rule on Every Page

Occupant load, number of exits, egress width, exit separation, travel distance, dead ends, doors, stairs and exit signs. Each topic gets its own page: the drawing first, then what you need to remember. 68 illustrated pages.

GET MEANS OF EGRESS ILLUSTRATED

🔒 Secure checkout · PDF by email · 30-day guarantee

Every topic, its own pageEach egress rule drawn on a floor plan, with the explanation right beside it
68 illustrated pages8 parts, from the egress path to the field walk
Up-to-date sourcesIBC Chapter 10, IFC Chapter 10 and NFPA 101
PDF by emailFormat

Look Inside the Book

Every page has one big drawing and a box with the numbers and limits you need to know:

Exit access → exit → exit discharge → public way, drawn as one route on one plan.
Exit access → exit → exit discharge → public way, drawn as one route on one plan.
Assembly rooms post their occupant load near the main exit; the owner keeps it up.
Assembly rooms post their occupant load near the main exit; the owner keeps it up.
One exit: up to 49 occupants in A, B, E, F, M, U, and the common path within limits.
One exit: up to 49 occupants in A, B, E, F, M, U, and the common path within limits.
Unsprinklered: two required exits at least 1/2 of the maximum diagonal apart, in a straight line.
Unsprinklered: two required exits at least 1/2 of the maximum diagonal apart, in a straight line.
Corridors: 44 in general, 36 in under 50 occupants, 72 in Group E serving 100+, 96 in for beds.
Corridors: 44 in general, 36 in under 50 occupants, 72 in Group E serving 100+, 96 in for beds.
Exit stair enclosure: 2-hour at 4+ stories, 1-hour below 4; basements count, mezzanines don't.
Exit stair enclosure: 2-hour at 4+ stories, 1-hour below 4; basements count, mezzanines don't.
Exit signs: required with 2+ exits; within 100 ft or the listed distance, whichever is less, of a visible sign.
Exit signs: required with 2+ exits; within 100 ft or the listed distance, whichever is less, of a visible sign.
Existing buildings: chained exits, stored boxes, wedged fire doors, burned-out exit signs.
Existing buildings: chained exits, stored boxes, wedged fire doors, burned-out exit signs.

Swipe to see more →

These are real pages from the book. The table of contents is the full one: 8 parts and 64 topics.

The Problem Isn't You. It's How It Was Explained to You.

You're reviewing a small retail space with a single door, and the designer tells you one exit is plenty.

You know there's a limit somewhere. But the chapter splits it across a paragraph, a table and an exception: occupant load in one place, occupancy group in another, common path in a third.

One exit: up to 49 occupants in A, B, E, F, M, U, and the common path within limits.

In the book, that same question is one page: the space drawn with its one door, the 49-occupant line, and groups A, B, E, F, M and U in a box, with the common path measured right on the plan.

Exit separation, travel distance, corridor width, stair enclosures and exit signs get the same treatment: each one has its own page.

You see it, you get it, and you answer the designer without flipping back through the code book.

COMPARE FOR YOURSELF

Same Topic, Two Ways to Learn It

THIS
  • Ten occupancy groups and their subdivisions in one paragraph
  • Occupancy groups explained only in words
  • You walk into the review with doubts
Prior to determining any egress requirement, the building or portion thereof shall be classified into one or more occupancy groups. The occupant load shall then be determined by dividing the floor area assigned to each function of space by the applicable occupant load factor, using gross or net area as indicated for that function. Where a space contains more than one function, the occupant load shall be computed separately for each portion and combined in accordance with the applicable provisions, and travel distance, common path and exit requirements shall be verified for each area.
FOR THIS
  • The occupancy groups in one drawing
  • The load factors you use most in a box: business 150 sq ft gross, unconcentrated assembly 15 net
  • You see it and you get it
Assembly rooms post their occupant load near the main exit; the owner keeps it up.
CONTENTS

Take a Look at the 8 Parts and 64 Topics

The egress path, occupant load, exits and egress width, separation and travel distance, corridors and doors, stairs and refuge, signs and discharge, and the plan review and field walk: 68 pages, all illustrated.

IThe Egress Path · pp. 5-11
  1. Means of Egress Is One Continuous Path
  2. Exit Access: Everything Before the Exit
  3. What Counts as an Exit
  4. Exit Discharge: From the Exit to the Public Way
  5. IBC or Life Safety Code: Same Path, Different Terms
  6. Edition Year and Local Amendments
  7. The Review Order You Use Every Time
IIOccupant Load · pp. 12-18
  1. Classify the Occupancy Before Any Number
  2. Gross Area vs. Net Area
  3. The Load Factors You Use Most
  4. Worked Example: An Office Floor
  5. Mixed Uses on One Floor
  6. Fixed Seating and Benches
  7. Posting the Occupant Load
IIINumber of Exits and Egress Width · pp. 19-26
  1. When One Exit Is Enough
  2. Exits per Story by Occupant Load
  3. Egress Width per Occupant
  4. Worked Example: 400 Occupants
  5. Losing One Exit: The 50% Rule
  6. Calculated Width vs. Minimum Width
  7. Egress From Floors Above and Below
  8. Main Entrance in Assembly Buildings
IVSeparation and Travel Distance · pp. 27-35
  1. Exit Separation: One-Half of the Diagonal
  2. Sprinklered: One-Third of the Diagonal
  3. Worked Example: Measuring the Diagonal
  4. Three or More Exits
  5. How Travel Distance Is Measured
  6. Travel Distance Limits by Occupancy
  7. Common Path of Egress Travel
  8. Dead-End Corridors
  9. Worked Example: Travel on the Plan
VCorridors, Aisles and Doors · pp. 36-45
  1. Corridor Width
  2. When a Corridor Must Be Rated
  3. What a Corridor Can Lose to Obstructions
  4. Aisles Inside Rooms
  5. Door Clear Width: Where You Measure
  6. Which Way the Door Swings
  7. Door Hardware: One Operation, No Key
  8. Panic Hardware: Where It Is Required
  9. Door Opening Forces
  10. Special Locking Arrangements
VIStairs, Ramps and Refuge · pp. 46-54
  1. Interior Exit Stairway Enclosure
  2. Stair Width
  3. Risers and Treads
  4. Landings
  5. Handrails
  6. Guards
  7. Ramps in the Means of Egress
  8. Accessible Means of Egress and Areas of Refuge
  9. Stairway Identification Signs
VIISigns, Lighting and Discharge · pp. 55-60
  1. Where Exit Signs Are Required
  2. Placing Signs: Visible and Directional
  3. Means of Egress Illumination
  4. Emergency Lighting: 90 Minutes
  5. Exit Discharge to the Public Way
  6. Outside the Door: Egress Courts and Exterior Stairs
VIIIPlan Review and Field Walk · pp. 61-68
  1. Plan Review Sequence on One Sheet
  2. Field Walk in the Same Order
  3. Existing Buildings: What You See Most
  4. Frequent Plan Review Errors
  5. Frequent Field Errors
  6. Writing an Observation With a Drawing
  7. Blank Plan Review Sheet
  8. Blank Field Checklist

One Page, One Topic, All Clear

Think of it this way:

You're walking a finished office floor before the certificate of occupancy, and you need to know if that back corridor is a dead end that runs too long.

You open the dead-end corridor page and see the corridor drawn on a plan, the dead end shaded and measured: 20 feet as the general limit, 50 feet on a sprinklered business floor.

Corridors: 44 in general, 36 in under 50 occupants, 72 in Group E serving 100+, 96 in for beds.

Occupant load, exit separation, door hardware, stair enclosures and exit discharge work the same way: each one on its own page.

Means of Egress Illustrated is 8 parts and 64 topics, all drawn, ending with a plan review sequence, a field walk in the same order and blank sheets ready to use.

What you see drawn, you don't have to memorize.

What's Inside Means of Egress Illustrated:

Ipp. 5-11

The Egress Path

The egress path as one route, exit access, exit, exit discharge, IBC vs. Life Safety Code terms, edition year and local amendments, and the review order you use every time.

IIpp. 12-18

Occupant Load

Classifying the occupancy first, gross vs. net area, the load factors you use most, an office floor worked out, mixed uses, fixed seating and posting the occupant load.

IIIpp. 19-26

Number of Exits and Egress Width

When one exit is enough, exits per story, egress width per occupant, a 400-occupant example, losing one exit, calculated vs. minimum width and the main entrance in assembly buildings.

IVpp. 27-35

Separation and Travel Distance

Exit separation at one-half and one-third of the diagonal, three or more exits, how travel distance is measured, limits by occupancy, common path, dead ends and a worked example on the plan.

Vpp. 36-45

Corridors, Aisles and Doors

Corridor width and ratings, obstructions, aisles, door clear width, swing, hardware, panic hardware, opening forces and special locking arrangements.

VIpp. 46-54

Stairs, Ramps and Refuge

Stair enclosures, stair width, risers and treads, landings, handrails, guards, ramps, accessible means of egress, areas of refuge and stairway identification signs.

VIIpp. 55-60

Signs, Lighting and Discharge

Where exit signs are required, placing them, egress illumination, 90 minutes of emergency lighting, discharge to the public way, egress courts and exterior stairs.

VIIIpp. 61-68

Plan Review and Field Walk

The plan review sequence on one sheet, the field walk in the same order, existing buildings, frequent plan review and field errors, writing an observation with a drawing, and blank sheets.

At the end of the book: A one-sheet plan review sequence, a field walk in the same order, and a blank review sheet and field checklist.

Plus: 2 Free Books

Egress Calculations Workbook: Floor Plans to Mark Up

BONUS 1: «Egress Calculations Workbook: Floor Plans to Mark Up»

Value on its own: US$ 17.90

Practice occupant load, exit count, diagonal separation and travel distance on blank floor plans, then check your work against the worked answers.

Egress Pocket Cards: One Check per Card

BONUS 2: «Egress Pocket Cards: One Check per Card»

Value on its own: US$ 14.90

Every key egress check on its own printable card, so you can review it at a glance before a plan review meeting or a field walk.

Means of Egress Illustrated with 2 Free Books

  • Means of Egress Illustrated: 68 illustrated pagesUS$ 63
  • BONUS 1: Egress Calculations Workbook: Floor Plans to Mark UpUS$ 17.90
  • BONUS 2: Egress Pocket Cards: One Check per CardUS$ 14.90
  • High-resolution PDF to printIncluded
Total value US$ 95.80
YOUR PRICE:
US$ 27
You save US$ 68.80
YES, I WANT MEANS OF EGRESS ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.

Secure purchaseEncrypted payment30-day guarantee

PDF by email: We email you Means of Egress Illustrated as a PDF, together with the two free books. It's a single payment: no installments, no extra charges.

Who This Book Is For

You just moved into fire prevention

You just moved into fire prevention

Egress review is a different job from the engine company. Here every rule is a drawing, in the order you'll use it on every plan.

You have a plan review meeting this week

You have a plan review meeting this week

Go over occupant load, exit count, separation and travel distance page by page, so you can explain each comment with a sketch.

You already inspect in the field

You already inspect in the field

Keep the field walk in the same order every time and print the pages for your binder: corridors, doors, stairs, signs and discharge, at a glance.

Everything You Get Today

US$ 95.80US$ 27
YES, I WANT MEANS OF EGRESS ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.

30DAYS
GUARANTEE

30-Day Guarantee

Try Means of Egress Illustrated for 30 days, bonus books included.

We refund everything if the file won't open, if the book isn't what you see here, if you were charged twice or if the email doesn't arrive. Just email us.

You pay once. No subscriptions.

Frequently Asked Questions

Is it for me if I already review egress on plans or in the field every week?

Yes. It's built for fire inspectors, plans examiners and building officials who already do the work. The first page puts the whole egress path on one drawing; from there each page goes to the numbers, the cases that come up in review (sprinklered vs. unsprinklered, basements in the story count, common path with one exit) and a worked example. The last part covers existing buildings and frequent plan review and field errors.

Where does the content come from?

From IBC Chapter 10 and IFC Chapter 10. The numbers on the pages are IBC values; NFPA 101 is noted as a parallel reference where it applies, so you always know which code you're reading. Every value is flagged so you can check it against the edition year and the local amendments your AHJ has adopted.

Is this official material?

No. It's independent study material, not affiliated with or endorsed by ICC or NFPA. It explains the rules in our own words and drawings. The code your AHJ has adopted always has the final word.

Does it replace code training or the code book?

No. It works alongside your training and your copy of the adopted code. It doesn't issue a certificate or continuing education credits. Use it to review, to keep the same order and to explain an observation with a drawing.

Are the practice floor plans taken from real projects or official materials?

No. The plans and exercises in the workbook were written for this book, and the worked answers are included so you can check your work.

When and how do I get it?

The book and the 2 bonus books are sent as PDFs by email, to the address you enter at checkout.

Do I have to pay every month?

No. It's a one-time payment.

Can I get it on paper?

It's sent as a PDF only; no printed copy is shipped. The PDF prints well at home or at a print shop, so you can keep it on your desk or in your field binder.

How does the refund work?

You have 30 days. We refund everything if the file won't open, if the book isn't what you see on this page, if you were charged twice or if the email doesn't arrive: just email us.

Before You Close This Page

No more rereading the egress chapter and having nothing stick.

Exit separation: you see the diagonal drawn, and you're set.

You walk into the review knowing where every rule is.

Drawings make studying faster.

The book is right below.

One-time payment: US$ 27 · Guarantee: 30 days · PDF by email

YES, I WANT MEANS OF EGRESS ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.